Upgrade, rollback, and release drills

10. Upgrade and rollback

10.1 Rolling upgrade with compatible handoff versions

  1. Stop the standby.
  2. Install the new release and matching deployment set on that host.
  3. Start it as standby.
  4. Confirm /health returns HTTP 200.
  5. Confirm /ready returns HTTP 503.
  6. Stop the old active router cleanly.
  7. Confirm the upgraded router owns a higher lease epoch.
  8. Confirm the upgraded router is the only ready backend.
  9. Upgrade the stopped router.
  10. Return it as standby.

10.2 Upgrade across a handoff-version change

Use a maintenance window.

  1. Stop ingress.
  2. Stop both routers.
  3. Install one coherent deployment set on both hosts.
  4. Start the active router.
  5. Start its standby.
  6. Restore ingress after admission state has been verified.

10.3 Roll back

Stop the new process before the previous build can claim the fleet.

Restore these as one unit:

  • code;
  • configuration;
  • profiles;
  • a state version supported by the restored build.

11. Validate every release

Before production admission, run the permitted engine-restart procedure and router failover on an idle fleet using the production supervisor and load balancer. Confirm the conditions below against the running engine processes and router lease.

Release drill pass conditions

Drill Pass condition
Individual engine restart Placement stops after drain, resident work reaches zero, and every readmission gate passes
Whole-wave restart Every action follows wave policy, readiness is withdrawn before stop, and the fleet is readmitted only after every restarted engine passes attestation and the KV ring completes
Router failover The load balancer selects one lease owner, roles and cumulative counters survive, and the previous primary remains fenced